I am guessing these are just some of the "quirks" of VDP 5.5.6.56 and being sorta free I am not expecting everything to run smoothly...but there are a couple of things I would like to see if they can be resolved. Below is a quick list of the issues encountered out of the gates...
1. Backup jobs scheduled times are not correctly reflected in the "next run time". Seems to get the date right but not the time. Edit again and refresh makes no difference. Jobs seem to start at the correct time but the GUI is displaying it incorrectly. VMware Tools is set to sync with the host for the VDP VMs, under configuration the correct date/time and timezone are shown and also checking the output from date command on the VDP box appears to be correctly set.
2. The backups of vCenter Servers running on Windows Server 2012 fail. However it says the last successful backup was OK in the reports in the bottom window frame after completing the backup job. I can restore the VM successfully, boots up no issues. Is this just a misrepresentation of the success/failure of the backup? Are there detailed logs on the VDP appliance?